Alessandro Mazzi

Cold ironing: from the grid to the ship connection

Cold ironing: from the grid to the ship connection

Alessandro Mazzi

Ports & Logistics

By Editorial Staff July 18, 2026 4m 42s

Cold ironing, or onshore power supply (OPS), connects two electrical systems designed with different logics: the port grid and the…

Tides: astronomical forcing and port design

Tides: astronomical forcing and port design

Alessandro Mazzi

Engineering

By Editorial Staff April 23, 2026 3m 39s

The tide is the periodic oscillation of sea level produced by the gravitational attraction of the Moon and the Sun…